Quantum量子訊息有限公司

Data Center On-Site Power Generation Market

完整報告名稱與涵蓋範圍
Data Center On-Site Power Generation Market Size, Share & Trends Analysis Report, By Technology (Gas Turbines and Reciprocating Gas Engines, Fuel Cells (Solid Oxide and Other), Small Modular and Advanced Nuclear Power Supply Agreements, Renewable, Storage and Hybrid Microgrids), By Operating Mode (Primary and Prime Power Behind-the-Meter, Bridging Power During Grid Interconnection, Backup, Peaking and Grid-Interactive Operation), By Capacity (Below 50 MW, 50 MW to 250 MW, Above 250 MW), By End User, By Region, and Segment Forecasts, 2026-2035

報告摘要

The data center on-site power generation market covers gas turbines and reciprocating engines, fuel cells, small modular and advanced nuclear supply arrangements and renewable, storage and hybrid microgrids deployed behind the meter for primary, bridging and grid-interactive power at data centers across capacity classes, serving hyperscalers, colocation providers and power developers. Diesel backup generators, utility-scale generation sold to the grid and the data center battery storage market addressed in a separate InsightAce study are excluded. The market has emerged because grid interconnection for gigawatt-scale AI campuses can take years, forcing operators to build on-site generation to energise facilities on schedule, and because power availability has become the binding constraint on AI capacity. Gas turbine and engine manufacturers have record backlogs from data center orders, fuel cell installations provide clean and rapidly deployable power, developers are pairing data centers with gas fields and stranded generation, and hyperscalers have signed nuclear agreements and restart deals for baseload supply. Emissions permitting, gas supply and pipeline capacity, turbine lead times, community opposition, the eventual transition of bridging assets to backup or grid roles and the cost of behind-the-meter power relative to grid tariffs shape investment. North America dominates given AI campus construction and interconnection delays, with the Middle East, Europe and Asia Pacific developing on-site solutions under grid and regulatory constraints. Competition involves turbine and engine manufacturers, fuel cell companies, utilities and power producers and energy developers specialising in data center supply. The InsightAce study provides US$ revenue forecasts for every technology, operating mode, capacity and end user and regional segment over 2026-2035, plus segment trend analysis, competitive landscape mapping and profiles of leading participants.

授權報價

Single User$4,500 USD
Enterprise / Global Site Licence$9,500 USD

目錄 Table of Contents

Chapter 1. Methodology and Scope 1.1. Research Methodology 1.2. Research Scope & Assumptions Chapter 2. Executive Summary Chapter 3. Global Data Center On-Site Power Generation Market Snapshot Chapter 4. Global Data Center On-Site Power Generation Market Variables, Trends & Scope 4.1. Market Segmentation & Scope 4.2. Market Drivers 4.3. Market Challenges 4.4. Emerging Trends 4.5. Investment and Funding Analysis 4.6. Industry Analysis - Porter's Five Forces Analysis 4.7. Competitive Landscape and Market Positioning 4.8. Market Opportunity Analysis Chapter 5. Market Segmentation 1: By Technology Estimates & Trend Analysis 5.1. Technology & Market Share, 2026 & 2035 5.2. Market Size (Value US$ Mn) & Forecasts and Trend Analysis, 2026 to 2035, by Technology: 5.2.1. Gas Turbines and Reciprocating Gas Engines 5.2.2. Fuel Cells (Solid Oxide and Other) 5.2.3. Small Modular and Advanced Nuclear Power Supply Agreements 5.2.4. Renewable, Storage and Hybrid Microgrids Chapter 6. Market Segmentation 2: By Operating Mode Estimates & Trend Analysis 6.1. Operating Mode & Market Share, 2026 & 2035 6.2. Market Size (Value US$ Mn) & Forecasts and Trend Analysis, 2026 to 2035, by Operating Mode: 6.2.1. Primary and Prime Power Behind-the-Meter 6.2.2. Bridging Power During Grid Interconnection 6.2.3. Backup, Peaking and Grid-Interactive Operation Chapter 7. Market Segmentation 3: By Capacity Estimates & Trend Analysis 7.1. Capacity & Market Share, 2026 & 2035 7.2. Market Size (Value US$ Mn) & Forecasts and Trend Analysis, 2026 to 2035, by Capacity: 7.2.1. Below 50 MW 7.2.2. 50 MW to 250 MW 7.2.3. Above 250 MW Chapter 8. Market Segmentation 4: By End User Estimates & Trend Analysis 8.1. End User & Market Share, 2026 & 2035 8.2. Market Size (Value US$ Mn) & Forecasts and Trend Analysis, 2026 to 2035, by End User: 8.2.1. Hyperscale and AI Cloud Operators 8.2.2. Colocation and Neocloud Providers 8.2.3. Independent Power Producers and Energy Developers Serving Data Centers Chapter 9. Data Center On-Site Power Generation Market: Regional Estimates & Trend Analysis 9.1. North America 9.1.1. United States 9.1.2. Canada 9.2. Europe 9.2.1. Germany 9.2.2. United Kingdom 9.2.3. France 9.2.4. Italy 9.2.5. Spain 9.2.6. Rest of Europe 9.3. Asia Pacific 9.3.1. China 9.3.2. Japan 9.3.3. India 9.3.4. South Korea 9.3.5. Australia 9.3.6. Southeast Asia 9.3.7. Rest of Asia Pacific 9.4. Latin America 9.4.1. Brazil 9.4.2. Mexico 9.4.3. Rest of Latin America 9.5. Middle East & Africa 9.5.1. GCC Countries 9.5.2. South Africa 9.5.3. Rest of Middle East & Africa Chapter 10. Competitive Landscape 10.1. Company Market Positioning Analysis 10.2. Strategic Developments (Partnerships, Expansions, Product Launches, M&A) Chapter 11. Company Profiles 11.1. Caterpillar Inc. (Solar Turbines) 11.2. GE Vernova Inc. 11.3. Siemens Energy AG 11.4. Baker Hughes Company 11.5. Bloom Energy Corporation 11.6. INNIO Jenbacher GmbH 11.7. Mitsubishi Power (Mitsubishi Heavy Industries, Ltd.) 11.8. Rolls-Royce Power Systems (MTU) 11.9. Wartsila Corporation 11.10. Cummins Inc. 11.11. Capstone Green Energy Corporation 11.12. Constellation Energy Corporation 11.13. NextEra Energy, Inc. 11.14. Crusoe Energy Systems LLC 11.15. VoltaGrid LLC

圖表清單 List of Tables & Figures

Table 1. Global Data Center On-Site Power Generation Market Revenue Forecast by Technology, 2026-2035 (US$ Mn) Figure 1. Global Data Center On-Site Power Generation Market Segmentation and Scope Overview Table 2. Global Data Center On-Site Power Generation Market Revenue Forecast by Operating Mode, 2026-2035 (US$ Mn) Figure 2. Global Data Center On-Site Power Generation Market Share by Technology, 2026 & 2035 Table 3. Global Data Center On-Site Power Generation Market Revenue Forecast by Capacity, 2026-2035 (US$ Mn) Figure 3. Interconnection Timelines Versus On-Site Power Deployment Speed for AI Data Centers Table 4. Global Data Center On-Site Power Generation Market Revenue Forecast by End User, 2026-2035 (US$ Mn) Figure 4. On-Site Generation Technology Mix and Capacity by Operating Mode, 2026-2035 Table 5. Global Data Center On-Site Power Generation Market Revenue Forecast by Region, 2026-2035 (US$ Mn) Figure 5. Asia Pacific Data Center On-Site Power Generation Growth Opportunity Analysis Table 6. North America Data Center On-Site Power Generation Market Revenue by Country, 2026-2035 (US$ Mn) Figure 6. Competitive Positioning of Key Data Center On-Site Power Generation Market Participants Table 7. Europe Data Center On-Site Power Generation Market Revenue by Country, 2026-2035 (US$ Mn) Figure 7. Porter's Five Forces Analysis of the Global Data Center On-Site Power Generation Market Table 8. Asia Pacific Data Center On-Site Power Generation Market Revenue by Country, 2026-2035 (US$ Mn) Figure 8. Gas Turbine and Engine Backlogs and Fuel Cell Deployments Driven by Data Center Demand Table 9. Strategic Developments of Leading Data Center On-Site Power Generation Market Participants, 2023-2026

提及公司

Caterpillar Inc. (Solar Turbines)GE Vernova Inc.Siemens Energy AGBaker Hughes CompanyBloom Energy CorporationINNIO Jenbacher GmbHMitsubishi Power (Mitsubishi Heavy Industries, Ltd.)Rolls-Royce Power Systems (MTU)Wartsila CorporationCummins Inc.Capstone Green Energy CorporationConstellation Energy CorporationNextEra Energy, Inc.Crusoe Energy Systems LLCVoltaGrid LLC

常見問題

這份報告可以先索取樣本嗎?

可以。建議購買前先申請樣本,提出申請後約 2 個工作天內提供,您可以先確認內容涵蓋範圍是否符合需求。

報告價格如何計算?

報告以美元標價,台幣報價依當日匯率換算並加計 5% 營業稅。不同授權版本(單人/多人/企業全站)價格不同,量子訊息會評估您的使用情境後提供最優惠報價。

下單後多久交付?如何付款?

一般 3–7 個工作天交付,實際依出版商狀況於下單前確認。收到報告確認無誤後開立台幣發票,30 天內電匯付款即可。

量子訊息有限公司為 InsightAce Analytic 在台灣的授權代理,提供報告購買、樣本申請與授權諮詢。電話 +886 2 7751 5192 ・ 聯絡我們